Lifting Cables and Chains
What you'll learn: How to calculate the work required to lift objects whose weight changes as you lift them, like cables or chains coiled on the ground.
The Core Challenge
Unlike lifting a fixed-weight object (like a bucket), when you pull up a cable or chain from the ground, the weight you're lifting decreases as more of it leaves the ground. At the start, you're lifting the entire cable's weight; near the end, you're only lifting the last few feet. This makes the force variable, perfect for integration.
Setting Up the Problem
Think of a chain lying on the ground. To lift it completely:
- Divide the chain into tiny pieces of length Δx
- Each piece has weight = (weight per unit length) × Δx
- Each piece must be lifted a different distance depending on where it starts
The key insight: a piece of chain originally at height x from the bottom must be lifted a distance of (total height - x) to reach the top.
The Work Integral
If a cable has length L and weighs ρ (rho) pounds per foot, the work to lift it completely is:
W = ∫₀ᴸ ρ·x dx
Here, x represents the distance each piece travels. The variable x goes from 0 (the bottom piece, lifted the full length L) to L (the top, which doesn't move).
Example Setup
A 50-foot chain weighing 2 lb/ft coiled on the ground:
- Work = ∫₀⁵⁰ (2x) dx = [x²]₀⁵⁰ = 2500 foot-pounds
Key Takeaway: When lifting cables or chains, the work integral accounts for variable weight by integrating (weight per unit length) × (distance traveled) over the entire length of the object.